Page 3

This shows the cheapo way of keeping the concrete wet for proper curing.  At this point we've poured the deep end wall, the deep end floor, the vertical wall rising to the "play area" floor, and the "play area" floor itself.  We're starting to realize that we won't be swimming by the 4th of July.

Pool Home page

 Construction links:    1   2   3   4   5   6   7   8   9   10